Page 299 - Praxair - Specialty Gases and Equipment Reference Guide
P. 299
Gas Delivery Systems
Protocol Rack and Roof Systems
Protocol Rack and Roof Systems Ordering Information –
These systems have been developed with safety and security in ProSpec Regulator Racking System
™
mind. These high quality mounting systems can be used in the lab Single – Multi-regulator wall mounting system
or outside. The racking system is designed to be mounted to a 1, 2 and 3 Cylinder Process Racks – Awning/Rain Shield Option
suitable floor surface to safely secure cylinders and when properly Mounting Station
mounted meets NFPA requirements, while the roof system offers PRS R A
protection for outside Installations. ProSpec Racking System Number of Stations
1
These high quality roof/rack systems come complete with 2
multiple regulator configurations and options. 3
Station Positon #1
B C D
Designation Option Designation CGA Number Designation Pressure
1 PRS4012 1 580 1 0-15
2 PRS4002 2 590 A 0-40
3 PRS4032 3 540 2 0-50
4 PRS4022 4 350 3 0-100
5 PRS3012 5 320 B 0-120
6 PRS3002 6 510 C 0-200
7 PRS3032 7 326 4 0-250
8 PRS3022 8 330 5 0-500
9 PRS2012 9 660 7 0-150
A PRS2002 A 680 8 0-750
B PRS4092 B 703 9 0-1500
C PRS4093 C 677 D 0-2500
E 0-4500
F 0-6000
Station Positon #2
E F G
Designation Option Designation CGA Number Designation Pressure
0 None 0 None 1 0-15
1 PRS4012 1 580 A 0-40
2 PRS4002 2 590 2 0-50
3 PRS4032 3 540 3 0-100
4 PRS4022 4 350 B 0-120
5 PRS3012 5 320 C 0-200
6 PRS3002 6 510 4 0-250
7 PRS3032 7 326 5 0-500
8 PRS3022 8 330 7 0-150
9 PRS2012 9 660 8 0-750
A PRS2002 A 680 9 0-1500
B PRS4092 B 703 D 0-2500
C PRS4093 C 677 E 0-4500
F 0-6000
Section E – Gas Handling Equipment
Station Positon #3
Features and Benefits
H I J
n Ease of securing cylinders n Check Valves in Inlet Gland Designation Option Designation CGA Number Designation Pressure
Helps ensure NFPA compliance Helps prevent contamination 0 None 0 None 1 0-15
and back flow 1 PRS4012 1 580 A 0-40
n User Friendly Changeover
System n Modular Construction 2 PRS4002 2 590 2 0-50
One knob switches cylinder Allows for easy installation, 3 PRS4032 3 540 3 0-100
priority modular design for a smaller 4 PRS4022 4 350 B 0-120
C
320
5
0-200
PRS3012
5
foot print
n Flexible Pigtails 6 PRS3002 6 510 4 0-250
3' – 316 stainless steel with 7 PRS3032 7 326 5 0-500
armor casing Monel for 8 PRS3022 8 330 7 0-150
®
oxygen service 9 PRS2012 9 660 8 0-750
0-1500
PRS2002
680
A
9
A
B PRS4092 B 703 D 0-2500
C PRS4093 C 677 E 0-4500
Specifications F 0-6000
n Rack System n Roof
Welded mild steel: 304 Stainless Steel Awning
Powered coated white for inside K
installations. n Regulator Designation Option
Reference the specifications
Powered coated grey for outside section for the desired regulator. 1 No Awning
installations Use the listing on page E •241 2 With Weather Awning
to find the page number Option
i Protocol racks must be used Other configurations are available. Please contact your
with compatible gas service. local Praxair representative for further information.
E•298 1-877-PRAXAIR www.praxairdirect.com